- U.S. Power Plants
- Missouri
- Jasper County, MO
- Joplin, MO
- State Line Combined Cycle
2299 S State Line Ave, Joplin, MO 64804
Plant Summary Information
State Line Combined Cycle is ranked #9 out of 116 power plants in Missouri in terms of total annual net electricity generation.
State Line Combined Cycle is comprised of 4 generators and generated 791.8 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | State Line Combined Cycle |
---|---|
Utility Name | Empire District Electric Co |
Location | Jasper County, MO |
Initial Operation Date | May 1995 |
Last Update | Mar 2024 |
Annual Generation | 2.7 TWh |
Annual Consumption | 20.0 M MMBtu |
Ranked #457 out of 11,249 Power Plants Nationwide | |
Ranked #276 out of 2,188 Natural Gas Power Plants Nationwide | |
Ranked #9 out of 116 Missouri Power Plants | |
Ranked #2 out of 37 Missouri Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.8% |
Map of State Line Combined Cycle
Full Screen Map
Register Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for State Line Combined Cycle.
Create Your Account Today
Monthly Net Generation for State Line Combined Cycle
- Download as CSV
- Download as Excel
- Download as JSON
- Download as JSON (pretty)
State Line Combined Cycle Details
Summary Information | |
---|---|
Plant Name | State Line Combined Cycle (7296) |
Plant Address | 2299 S State Line Ave Joplin, MO 64804 |
Utility | Empire District Electric Co (5860) |
Latitude, Longitude | 37.0659, -94.614 |
Generation Dates on File | Jan 2001 to Mar 2024 |
Initial Operation Date | May 1995 |
Annual Generation | 2.7 TWh |
Fuel Types | Natural Gas : 99.8% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Municipality, Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | Empire District Electric Co (5860) MO |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | SOUTHERN STAR CENTRAL GAS PIPELINE |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
* Data obtained from the 2022 EIA 860 Report
Generator 1 DetailsOperatingMay 1995
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | EDESTL4391UN1_ |
RTO ISO Location Designation For Reporting Wholesale Sales Data | EDESTL4391UN1_ |
Nameplate Capacity | 123 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 94 MW |
Winter Capacity | 104 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 1995 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Jet Fuel |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 94 MW |
Net Winter Capacity With Natural Gas | 104 MW |
Net Summer Capacity With Oil | 94 MW |
Net Winter Capacity With Oil | 104 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 2-2 DetailsOperatingJune 1997
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Jointly Owned |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | EDESTL4391UNCT2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | EDESTL4391UNCT2 |
Nameplate Capacity | 180 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 175 MW |
Winter Capacity | 200 MW |
Minimum Load | 75 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 1997 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2-1 DetailsOperatingJune 2001
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Jointly Owned |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | EDESTL4391UNCT1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | EDESTL4391UNCT1 |
Nameplate Capacity | 181 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 175 MW |
Winter Capacity | 200 MW |
Minimum Load | 75 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2001 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2-3 DetailsOperatingJune 2001
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Jointly Owned |
Duct Burners | No |
Nameplate Capacity | 206.5 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 186 MW |
Winter Capacity | 186 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2001 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
State Line Combined Cycle Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Empire District Electric Co | P O Box 127602 Joplin Street, Joplin, MO 64802 | Generator 2-1 | 60.00% |
Evergy Kansas Central, Inc | 818 South Kansas Avenue, Topeka, KS 66601 | Generator 2-1 | 40.00% |
Empire District Electric Co | P O Box 127602 Joplin Street, Joplin, MO 64802 | Generator 2-2 | 60.00% |
Evergy Kansas Central, Inc | 818 South Kansas Avenue, Topeka, KS 66601 | Generator 2-2 | 40.00% |
Empire District Electric Co | P O Box 127602 Joplin Street, Joplin, MO 64802 | Generator 2-3 | 60.00% |
Evergy Kansas Central, Inc | 818 South Kansas Avenue, Topeka, KS 66601 | Generator 2-3 | 40.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#266 | Brunner Island | York Haven, PA | 3.0 TWh |
#267 | Tenaska Lindsay Hill Generating Station | Billingsley, AL | 2.8 TWh |
#268 | Stanton Energy Center | Orlando, FL | 5.8 TWh |
#269 | Eastman Cogeneration Facility | Longview, TX | 2.8 TWh |
#270 | Gulf Clean Energy Center | Pensacola, FL | 2.8 TWh |
#271 | ExxonMobil Baytown Turbine | Baytown, TX | 2.8 TWh |
#272 | Hidalgo Energy Center | Edinburg, TX | 2.7 TWh |
#273 | Columbia Energy Center (SC) | Gaston, SC | 2.7 TWh |
#274 | Bergen Generating Station | Ridgefield, NJ | 2.7 TWh |
#275 | Fore River Generating Station | North Weymouth, MA | 2.7 TWh |
#277 | McClain Energy Facility | Newcastle, OK | 2.7 TWh |
#278 | Caithness Long Island Energy Center | Yaphank, NY | 2.7 TWh |
#279 | Bridgeport Energy Project | Bridgeport, CT | 2.7 TWh |
#280 | Northport | Northport, NY | 2.7 TWh |
#281 | Mountainview Generating Station | Redlands, CA | 2.7 TWh |
#282 | Corpus Christi Energy Center | Corpus Christi, TX | 2.7 TWh |
#283 | James E. Rogers Energy Complex | Cliffside, NC | 5.8 TWh |
#284 | Northeastern | Oologah, OK | 4.0 TWh |
#285 | Freeport Energy | Freeport, TX | 2.6 TWh |
#286 | Apex Generating Station | Las Vegas, NV | 2.6 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding State Line Combined Cycle.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Beaver Dam | Eureka Springs, AR | 163.2 GWh | 61.5 mi |
Carthage | Carthage, MO | 2.1 GWh | 18.9 mi |
Chanute 3 | Chanute, KS | 4.7 GWh | 61.4 mi |
Coffeyville, KS | 97.2 GWh | 53.6 mi | |
Coffeyville | Coffeyville, KS | 1.9 GWh | 55.1 mi |
Empire Energy Center | Sarcoxie, MO | 283.9 GWh | 28.5 mi |
Erie | Erie, KS | 13.3 MWh | 48.7 mi |
Erie Energy Center | Erie, KS | 3.6 GWh | 49.1 mi |
Flint Creek | Gentry, AR | 2.2 TWh | 56.2 mi |
Girard | Girard, KS | 467.7 MWh | 32.9 mi |
Jayhawk Wind Energy Center | Hepler, KS | 668.6 GWh | 49.7 mi |
Kings Point Wind Energy Center | Golden City, MO | 601.6 GWh | 34 mi |
Neosho Ridge Wind Energy Center | Near Galesburg, KS | 1.3 TWh | 51 mi |
Nevada | Nevada, MO | 1.9 GWh | 56.2 mi |
North Fork Ridge Wind Energy Center | Mindenmines, MO | 563.5 GWh | 23.1 mi |
Oak Grove Power Producers | Arcadia, KS | 16.0 GWh | 39 mi |
Pensacola | Langley, OK | 417.8 GWh | 47.6 mi |
Prosperity Solar Farm CSG | Joplin, MO | 3.3 GWh | 10.8 mi |
Riverton | Riverton, KS | 1.1 TWh | 4.7 mi |
Stockton Hydro | Stockton, MO | 81.7 GWh | 63.5 mi |